CHEMKOP-LABORGEO has been provided a wide range of services for government agencies, business, and individuals. Our track record of successful jobs and satisfied customers is evidence that we can fulfil your requirements. We invite you to contact any of our references.

Services for Hydrotechnical Constructions:



Service provided:
  • Geological site investigations and engineering geological reports for the technical designs of water dams in HAŃCZA, NIEWISTKA, DOBROMIERZ, SOLINA, MYCZKOWCE
  • Full geological and laboratory service for earth works for dam constructions in CZORSZTYN-SROMOWCE and KLIMKÓWKA
  • Special investigations (rock shear test) in adits and installation of bench marks at dam constructions in CZORSZTYN, KLIMKÓWKA, ŚWINNA PORĘBA, and WIÓRY

Reference Contact:
Okręgowa Dyrekcja Gospodarki Wodnej w Krakowie (Regional Board for Water Management in Cracow)


Service provided:
Investor's supervision, geological and laboratory service for rock and earth works, deposit documentation, geological engineering reports for the dam construction in WIÓRY near Ostrowiec Świętokrzyski

Reference Contact:

Okręgowa Dyrekcja Gospodarki Wodnej w Warszawie (Regional Board for Water Management in Warsaw)


Service provided:
DYCHÓW dam - Geological and technological supervision of the reconstruction of the dam embankment, construction of a cut-off wall, and vibro-flotation. Installing of inclinometers and piezometers in the scope of the instrumentation project.

Reference Contact:

Hydroprojekt, Warszawa, ul. Dubois 9


Service provided:
Geological, technological, and laboratory supervision of the flood-embankments construction for the Vistula River in Źródła, Jankowice, and Smolice.

Reference Contact:
Przedsiębiorstwo Budownictwa Wodno-Inżynieryjnego (Enterprise for Water Engineering Constructions)



Service provided:
Geological supervision and laboratory tests for geological engineering assessment of the site (February - July 2001) of the planned water storage reservoir in Racibórz Dolny.

Reference Contact:
Polish Academy of Sciences, Dr Eng. Wiesław Sroczyński




Service provided:
Installation of the computer monitoring equipment in the dam core and embankments in the KLIMKÓWKA and CZORSZRTYN-SROMOWCE sites (1991-1995)

Reference Contact:
Okręgowa Dyrekcja Gospodarki Wodnej w Krakowie (Regional Board for Water Management in Cracow)





Service provided:
CHEMKOP-LABORGEO was retained by KGHM - Polska Miedź - S.A. to install the monitoring equipment in the "Rudna-Żelazny Most" Flotation Tailing Reservoir. In 1996, boreholes totalling 210 lineal metres were drilled for inclinometers in the reservoir embankments. In 1997, special boreholes for micro-seismic survey totalling 300 lineal metres and piezometers of 540 lineal metres were drilled within the tailing sediments in the reservoir. In 1999-2000, inclinometers totalling 313 lineal metres were installed.

Reference Contact:
Prof. Wojciech Wolski, PhD., Katedra Geotechniki, Szkoła Główna Gospodarstwa Wiejskiego W Warszawie, (Geotechnics Chair, Warsaw Agricultural Uniwersity)
Stanisław Krajewski, MSc. KGHM - Polska Miedź - S.A., Lubin Legnicki





Dewatering of Excavations



Service provided:
- In 1997, CHEMKOP-LABORGEO was retained to carry out dewatering of the trunk sewer trenches in Gdów and Ostrowsko-Waksmund.
- Dewatering of a road tunnel and access roads to the Zakopianka Retail Centre in Kraków, 1998.

Reference Contact:
Adam Grotowski, Director of Hydrotest-ORS, Kraków


Service provided:
Since 1997 CHEMKOP-LABORGEO has carried out both designing and supervision of dewatering works related to excavations for tram and road tunnels and a railway station construction - Kraków Communication Centre Project.

Reference Contact:
Włodzimierz Pagacz, Project Director


Service provided:
Dewatering of excavations for a hotel building at the Sołtysowska site in Kraków, 1997.

Reference Contact:
Texbud, Kraków


Service provided:
Dewatering of excavations for the water intake construction in the Łęg Heat Power Station, 1997

Reference Contact:
Łęgprzem, Kraków


Service provided:
Dewatering works for the construction of the ISUZU apartment complex at the Wola Justowska site in Kraków, 1999

Reference Contact:
SANLEY Polska S.A.



Service provided:
In 1999, CHEMKOP-LABORGEO was retained by COCEFI Polska for dewatering works at the construction site of Bank Śląski Centre in Katowice.

Reference Contact:
Eric Van Aelbroeck, Project Director
Wiesław Skoczek, Project Vice-Director



Contamination Assessment of Soil and Groundwater

Service provided:
In 1992 and 1994, CHEMKOP-LABORGEO carried out drillings and geological investigations to assess the contamination of six allotments in Śląsk Province. A total number of 49 monitoring wells ranging from 6 to 20 m in depth were drilled in two stages. The job was ordered and strictly supervised by GIBB ENVIRONMENTAL SCIENCES - UK, one of the world's leading providers of environmental monitoring of contaminated soils and ground water and cleanup solutions.
In 1994, Hydroeko - Warszawa conducting BRGM's Project (France) retained CHEMKOP-LABORGEO for contamination assessment and cleanup of the Zakłady Sodowe SOLVAY site in Kraków. A network of the monitoring wells was drilled under the BRGM specialists' supervision. In the result of the cleanup operations, 2500 litres of diesel oil were extracted from the ground around the site of the past filling station.

Reference Contact:
Andrzej Rodzoch, MSc., Hydroeko - Warszawa, BRGM Sole Representative



Service provided:
In 1996 for Military University of Technology, CHEMKOP-LABORGEO carried out works to assess the contamination of soil and groundwater in the site of a great liquid fuel station in the Military Base No. 4013 in Radnica. According to the EPA standard, CHEMKOP-LABORGEO drilled inspection boreholes totalling 500 lineal metres and installed monitoring well totalling 230 lineal metres.

Reference Contact:
Col. Andrzej Spychała, PhD., Professor and Vice-Rector of the Military University of Technology, Warszawa



Geotechnical Investigations for Building Projects

Service provided:
In 1998, CHEMKOP-LABORGEO carried out the site investigations covering drilling of boreholes, elaboration of the engineering geological report, and design of contamination monitoring of soil and groundwater ordered by:

  • Ośrodek Badawczo-Rozwojowy Procon (Design and Research Centre Procon) to appraise the site in T. Sendzimir Still Mills in Kraków. The Client was Voest Alpine Austria and the job was supervised by Dames&Moore, UK
  • Toyota Motor Corporation to appraise the site of Special Economic Area in Wałbrzych and Legnica. The job was supervised by GIBB Environmental, UK
  • TESCO - Polska to appraise the Kapelanka site in Kraków. The job was supervised by WS Atkins, UK

Reference Contact:

  • Prof. Wojciech Wolski, PhD., Katedra Geotechniki, Szkoła Główna Gospodarstwa Wiejskiego W Warszawie, (Geotechnics Chair, Warsaw Agricultural Uniwersity)
  • Chris Wright, MSc., GIBB Environmental, Director of Environmental Technology, Oldbury,UK
  • Paul Bocheński, MSc., Dames & Moore, Twickenham England,
  • StanislausLeonhard, Voest Alpine Stahl, Katowice
  • Krzysztof Droń, MSc., WS Atkins Polska, Warszawa

Service provided:
In 1999, CHEMKOP-LABORGEO was retained by Tishman Speyer Properties for the site investigations for the planned "Nowe Miasto Kraków" retail and commercial centre. The job covering drillings and geological engineering report was supervised by Ove Arup and Partners Consulting.

Reference Contact:
- Chris Humnicki, Tishman Speyer Properties
- Paul Morrison, Ove Arup & Partners - Geotechnics, London



Service provided:
1999, Site investigation - Drillings and geological engineering report for the planned Sheraton Hotel in Kraków

Reference Contact:
Carlo Shreurs, Resident Manager, Cocefi Warszawa


Geological Assessment of Mineral Resources

Service provided:
1998, Jagniówka II aggregate resource in Tarnów County covering the area of 40 ha - CHEMKOP-LABORGEO provided the application package of geological documentation required for mining licence - the geological evaluation, the design of resource development, the mining operation plan, and the assessment of mining impact to the environment.

Reference Contact:
The Client - Bronisław Brózda, Myślenice



Geotechnical Investigations for Landslide Risk

CHEMKOP-LABORGEO's special service is guidance and management of the geological engineering investigation for works preventing landslides through all its phases from the design to the final report.

Most important services provided for preventing landslide:
Country Route: No. 977 - November 1994, No. 99 - January 1995, No. 965 - July 1996, No. 956 - August 1997, No. 4 - May 1998, No. 970 - July 1998,
Province Route No. 15960 - January 1997
County Route: No. 18237 - June 2000, No. 182231 - June 2000

And also:
Country Route No. 7 - the geological engineering report for the conceptual design of the reconstruction of the Lubień - Zabornia single carriageway section to the 2nd class expressway - January 2000

Reference Contact:
Generalna Dyrekcja Dróg i Autostrad, Oddział Południowo-Wschodni w Krakowie (General Board for Roads and Highways, South-East Division in Kraków)
Biuro Projektowo-Badawcze Dróg i Mostów Transprojekt, Warszawa
(The Road and Bridge Design and Research Office Transprojekt, Warszawa)